Installation steps and considerations for belling machine

Foundation requirements
Second, the separate packing of Bay and expanding two parts joined together on the location of the installation, fastening the other mounting screw.
Third, if the online production, installed in the machine axis coincides with the axis of the production line and to adjust the Center height.
Four, the front of the machine around the level of correction.
Five, to the fuel tank 160 litres of hydraulic oil, pure YA-N46 is injected, oil to be kept clean and free of impurities, oil should be injected through the filter.
Six, all lifting screw, guide bushings, Guide bar, chain, sprockets raises the right amount of grease.
Bus access to seven, according to the circuit diagram power supply and control lines.
Eight, according to the water supply, drain hose of duct and connecting the machine.