PERT under floor heating pipe making machine

PERT Pipe Production Making Machine (16mm-32mm)

  • Model NO.: Pipe extrusion line

  • Screw No.: Single-screw

  • Computerized: Computerized

  • Customized: Customized

  • Plastic Processed: Pert, PE

  • Output:Max.: 100

  • Trademark: Zhaoxing

  • Specification: Customized

  • HS Code: 8477800000

  • Product Type: PERT Pipe

  • Automation: Automatic

  • Certification: ISO9001:2008

  • Condition: New

  • Application: Hot Water Supply

  • PipeGuaranteed Time: 12 Months

  • Package: Nude or Wooden Cases

  • Origin: China


The PERT pipe produced by our line are mainly used for underground heating. 

Our line can produce ppr pipe by only changing the mould.


Technical Specification:
 Main specsModel (Groove Feed Type)SJ-65SJ-75SJ-90
Pipe Range (mm)16-6316-11063-160
Capacity (kg/hr)100125160
Main Motor (kw)375575
Haulling Speed (max. M/min)2-82-82-8
Total Power (kw)80105140
Line Length (m)303850
Vacuum TankPump Drive (kw)2.23.73.7 & 2.2
Length (mtrs)666
Water TankPump Drive (kw)3.73.73.7
Length (mtrs)-66+6
 

Finished Products:


2. DETAILED FEATURES

  • Screw Type: special single screw extruder for PERT with high extruding speed and effective plasticization. Separation mixing screw specialized for polyolefin.

  • Extrusion Type: specially designed three co-extruding die, reasonable channel, smooth outside and inside wall, and little internal stress.

  • Pipe Dia: 16mm to 25mm, extruding speed 35m/min,50m/min 



3. OUR SERVICE
We have over 15 years of experience of plastic extruders, for over 15 years our strong point are to design and manufacture efficient, durable and easy to use equipment. Now we have a professional technical team to support our products' update, pre-sales and after-sales service. "Clients first" are our very principle.
 

4. Pre-Sales Service

  •  Inquiry and consulting support. 

  • Equipment pre-commissioning& testing support. 

  •  View our Factory.

 

5. After-Sales Service

  • Machinery warranty time is 12 months starting from the date of Bill of Lading. Electric and electronic parts excluded.

  • Training how to install the machine and how to use the machine. 

  •  Engineers available to service machinery overseas.